SDLG
04Electric
● HEV LINEUP · 2026

Electric and Hybrid Lineup.Eight machines. Zero on-site emissions.

Five wheel loaders, three excavators and one range-extender hybrid — from a 2.35-tonne mini-excavator to the 26.6-tonne L980HEV. All on the same DC fast-charging architecture.

2
models in lineup
L940HEV
— to L980HEV
180—350
kWh battery range
67 min
DC fast-charge time
Machine type
AllWheel LoaderExcavatorHybrid
Application
AllIndoor stockyardMiningUrban infraPortESG-priority site
Battery class
All< 100 kWh100 — 350 kWh> 350 kWh
03Where electric pays off

Five duty cycles where electric beats diesel.

Air-quality regulation, ESG disclosure mandates and cheap grid electricity make these the obvious sites for the HEV switch.

Indoor stockyard
A1

Indoor stockyard

Cement clinker, paper-mill, food-grade — zero diesel exhaust, operator air-quality compliant.

Mining ESG
A2

Mining ESG

Iron-ore stockyards with carbon-disclosure mandates. L980HEV runs full mining shifts.

Urban infra
A3

Urban infra

Metro construction, demolition and night-shift work where diesel-noise rules out conventional fleet.

Ports
A4

Ports

Bulk-bag handling under air-quality and noise-restriction zones. Quiet-mode passes margin.

Round-the-clock
A5

Round-the-clock

L970HHB range-extender hybrid keeps operating where DC charging windows are short.

04Why HEV

Three reasons the economics flipped in 2025.

01
0
tail-pipe emissions

Zero on-site emissions

No diesel exhaust in confined indoor stockyards, mining tunnels or port-shed environments. Worker-air quality complies with the toughest Indian site norms.

02
1—1.5h
DC fast-charge

Fast-charge or swap

DC fast-charge across the lineup — 1 hour on the smaller machines, 1.5 hours for the 423 kWh L960HEV/L980HEV pack.

03
Yr 3
TCO crosses diesel

TCO crosses by year three

Single-shift operations cross diesel TCO from year three; double-shift mining and ESG-priority sites cross even sooner.

05Next Step

Site-feasibility audit in 10 days.

Our regional team visits, audits your duty cycle and grid infrastructure, and returns with a charger plan and ROI model — before you commit to a single HEV machine.